Germany has launched a €500m ($560m) Fusion Milestone Programme to accelerate the commercial development of nuclear fusion power plants. The initiative, managed by SPRIND, the Federal Agency for Disruptive Innovation (Bundesagentur für Sprunginnovationen), on behalf of the Federal Ministry of Research, Technology and Space (BMFTR Bundesministerium für Forschung, Technologie und Raumfahrt), aims to propel private-sector fusion start-ups and young technology firms from basic laboratory research into commercial market readiness.
The federal government is allocating €500m by 2029 through its Special Fund for Infrastructure and Climate Neutrality (SVIK – SonderVermögen Infrastruktur und Klimaneutralität). In the longer term, total public funding is projected to scale up to €2.5bn as companies build out blueprints and scale construction toward a demonstration power plant.
“With this programme, we are deliberately taking a new and bolder approach: We don’t just fund technologies, we support the development of strong companies,” said SPRIND Director Rafael Laguna de la Vera. “What matters most is measurable progress, rapid learning and a willingness to consistently reallocate resources when our own results or external developments show that our assumptions were wrong. That is why we are pursuing several approaches in parallel – knowing that not all of them will ultimately succeed. Even discontinued approaches can yield valuable technologies, insights and experience. That’s exactly how innovation happens: through competition between ideas, speed and a relentless focus on what actually works.”
Rather than relying on traditional rigid grants, the funding awards are directly linked to performance. Start-ups must submit precise technological and financial development roadmaps. Public financing is unlocked dynamically as independent experts evaluate and verify the completion of these individual milestones. If a start-up fails to meet an agreed milestone, it is eliminated, and its funding stops immediately.
The programme acts as a public-private de-risking tool. By verifying and co-funding early technology milestones, it aims to lower the barrier to entry, drawing in substantial global venture capital and private equity to fully fund the ultimate power plant construction phases.
Participating companies will work toward creating a comprehensive Technical Design Report that serves as a manufacturing blueprint for a commercial-scale demonstration plant. Rather than picking a single winning technology prematurely, the programme supports multiple technological concepts, allowing competing magnetic confinement and laser-driven inertial confinement approaches to develop concurrently. The programme explicitly funds multiple competing fusion methods simultaneously to hedge risks and identify what works fastest.
The initiative is a centrepiece of Germany’s broader Fusion Action Plan, structured under the country’s flagship High-Tech Agenda Germany (HTAD – High-Tech Agenda Deutschland). It is designed to work in tandem with existing academic and industrial collaborative frameworks, such as the Fusion 2040 research framework and three newly consolidated national fusion technology hubs. By building out these parallel public-private pathways, Germany aims to establish an economically viable, operating commercial fusion power plant on its own grid by the 2040s.
“Fusion has seen major scientific breakthroughs in recent years and is on the threshold of moving from basic research to industrial and commercial applications,” said Federal Research Minister Dorothee Bär. “Around the world, private entities and government institutions are investing heavily in bringing the first fusion power plants to reality. Germany is in an excellent position in this regard, and we intend to build on this position further.”
Germany is a leading centre of international fusion research. Two different Magnetic Confinement Fusion (MCF) methods are being researched at the Max Planck Institute for Plasma Physics in Garching near Munich (tokamak) and in Greifswald (stellarator). Scientists in Karlsruhe and Jülich are also working on the technology. A laser fusion power plant is planned for the site of the former nuclear power station in Biblis, Hesse.