Framatome has inaugurated a new €100m ($109m) workshop in Le Creusot (Saône-et-Loire), France, dedicated to manufacturing and assembling nuclear reactor pressure vessel internals.
The project involves the acquisition and complete overhaul of 15,000 square metres of industrial space, housed in a historic building originally inaugurated in 1973 for France’s 900 MWe reactor programme.
The workshop creates approximately 50 new jobs and includes two dedicated training centres for specialised welding and machining. The facility uses geothermal energy for indoor thermal regulation to minimise its industrial carbon footprint, alongside modern manufacturing traceability systems.
Reactor pressure vessel internals support and position nuclear fuel assemblies while guiding control rod drive mechanisms. Each unit requires the high-precision assembly of nearly 7,600 individual parts. Initial manufacturing began in July to supply France’s planned six EPR2 reactors (scheduled for Penly, Gravelines, and Bugey), with first deliveries set to start in 2032.
“The inauguration of this workshop marks a major step in strengthening our industrial capability. By developing this strategic and sovereign capacity in Le Creusot, we are consolidating the autonomy of the French and European nuclear sector, while meeting our customers’ needs in a context of global nuclear revival,” said Grégoire Ponchon, CEO of Framatome.
The creation of this workshop at Le Creusot is part of an effort to reinforce Framatome’s industrial capabilities in France and to internalise strategic competencies for the nuclear sector. The site was chosen because of the expertise that Framatome teams in Burgundy have developed over several decades in manufacturing nuclear components.
To host this new activity, Framatome acquired and transformed a workshop steeped in industrial history: the building was inaugurated in November 1973 by Prime Minister Pierre Messmer, as part of the development of the French nuclear programme and the production of second generation 900 MWe reactors.
The new facility also incorporates the latest technologies for monitoring and traceability of manufacturing operations. The building additionally houses two dedicated areas for training in welding and machining, in order to ensure the training and qualification of skills required for Framatome’s manufacturing activities in Burgundy.