Jacques Bouchard, director of the French atomic energy commission’s nuclear energy division, said that reprocessing combined with plutonium recycling and commissioning of fast neutron reactors will ensure long-term availability of uranium.
At the annual conference of the Japan Atomic Industrial Forum, Bouchard said: “With existing light water reactors, we burn only 1% of the natural uranium and put aside 99%, either in provisional storage or waste disposal. If we don’t improve this, we shall exhaust in a few decades the uranium that can be recovered at a low price.” Bouchard said France’s 250MWe PhĂ©nix reactor was undergoing inspection, renovation and maintenance operations “to be back on power before the end of this year”. PhĂ©nix’s future operation of six irradiation cycles would focus on “experimental studies contributing to technological demonstration of transmutation with fast neutron reactors”.
The end of the plant’s lifetime is now 2007-2008. It is the country’s only remaining fast neutron reactor, following the 1998 decision to close the 1200MWe SuperphĂ©nix plant.