German industry demands life extension for nuclear plants

11 April 2006


Jürgen Thumann, president of the Federal Association of German Industry (BDI) is calling for German nuclear plants to operate for longer than set out in the country’s controversial phase out agreement.

“Until now, nobody has been able to explain to me how our energy supply is supposed to function in future. Because the fact is that about 50% of the electricity production required for the base load is provided by nuclear energy. This base load cannot, in the foreseeable future, be economically replaced in Germany by regenerative energy, combined heat and power, or savings in electricity consumption. And on top of that, there is the fact that without nuclear energy, we will hardly be able to fulfil our obligations to protect the climate," says Thumann.

Extending the life of existing nuclear plants could facilitate transition to a phase without nuclear energy, Thumann said, adding that nuclear energy and renewables complement each other as two important components of a broad energy mix.




Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.