Decommissioning, UK (Deadline 26 August 2010)

5 August 2010


The scope of work described herein commences with the handover of work areas of the retrieval facility to the contractor to allow removal, characterisation and disposal of the combined C3 & C5 extract ventillation systems, balancing ducts between rooms, dampers and controls etc within each facility. This excludes the building supply air and electrical room extract systems which are to remain intact. Each facility houses a number of modular rooms contained within the overbuilding. The roof of each modular room forms the floor for the upper level services area with designated raised walkway areas faced in timber flooring. The overbuilding construction is of steel portal frame with insulated steel cladding walls and pitched roof. The intent of the decommissioning operations is to allow disposal of the Ventilation Systems by the applicable LLWR Limited container and to return the work areas to C0 as at the commencement of the project, thus allowing demolition of the buildings at a future date.

Excluding VAT

Range between 750 000 and 2 000 000 GBP

Contact:

LLW Repository Ltd

Blengdale Court

Attn: Tom Crowe

CA19 1UL Cumbria

UNITED KINGDOM

Tel. +44 1946722009

E-mail: tom.crowe@llwrsite.com

Fax +44 1946722260




Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.