The objective of this project is the modification of the ANPP emergency core cooling system (ECCS). The modification shall ensure reliable operation of the ECCS in any pressure conditions in primary circuit.
It will include modification of the ECCS pumps discharge line in the following way:
— delivery and installation of the set of the valves and devices for ECCS pumps in order to control the flow of the ECCS in all reactor installation operational modes,
— delivery and installation of the corresponding I&C devices.
A procurement notice will be published after 27 May 2010.
(No contact details given)