The China National Nuclear Corporation (CNNC) has begun hot functional testing for its Linglong One (ACP100) small modular reactor (SMR) at the Changjiang NPP in Hainan province. This represents one of the final major commissioning phases before nuclear fuel is loaded into the unit. Hot testing simulates the temperature and pressure conditions of a live nuclear environment using non-nuclear heat sources, verifying the integrity and safety of the reactor’s primary coolant circuits and auxiliary systems.
Linglong One is a multi-purpose, 125(MWe pressurised water reactor (PWR). It is the world’s first land-based commercial SMR to pass the International Atomic Energy Agency (IAEA) safety review, putting China significantly ahead of Western competitors in commercial SMR deployment.
Once operational, the reactor is expected to generate approximately 1 TWh a year, enough to supply some 526,000 households while cutting carbon dioxide emissions by 880,000 tonnes annually. Beyond standard electricity generation, the compact design allows it to provide district heating, industrial steam production, or seawater desalination.
Construction on the demonstration project originally began in July 2021 with cold functional testing completed in October 2025. Following hot testing and subsequent fuel loading, the plant is on track for full commercial operation.