Design, study, fabrication, transport, packaging and acceptance by a Belgian control commission of eight butterfly valves, classified according to ASME III code, safety class 3.
CONTACT:
Electrabel S.A. – Kerncentrale Doel
Haven 1800, Scheldemolenstraat
9130 Doel
BELGIUM
www.electrabel.com
Further information can be obtained at: Tractebel Engineering SA,
Avenue Ariane, 7
Attn: M. Lennert Van Damme
1200 Brussels
BELGIUM
Tel. +32 27738285
E-mail: lennert.vandamme@gdfsuez.com
Fax +32 27738900
Internet: www.tractebel-engineering-gdfsuez.com
DESCRIPTION:
Title attributed to the contract by the contracting entity: 0150-P.000954/1: Design, study, delivery, design, qualification and assembly of eight ventilation valves of the Doel1 and 2 reactor building
Type of contract and location of works, place of delivery or of performance: Supplies. Purchase.
Main place of delivery B-9130 Doel
Short description of the contract or purchase(s):
This contract concerns the design, study, delivery, design, qualification and assembly of eight ventilation valves of the Doel1 and 2 reactor buildings.
DURATION OF THE CONTRACT OR TIME LIMIT FOR COMPLETION
Starting 1.3.2011 Completion 25.5.2013
LOT NO: 1 TITLE Fabrication and provision of 8 ventilation valves with driving unit
Delivery includes:
— Design, study, fabrication, transport, packaging and acceptance by a Belgian control commission of eight butterfly valves, classified according to ASME III code, safety class 3,
— Testing of the raw materials (mechanical and chemical),
— Full documentation reports with respect to design, studies, material and testing.
These valves are part of the ventilation system of the Doel1 and Doel2 reactor buildings. They fulfill a crucial safety function because they have to contain a possible radioactive contamination within the containment building.
Starting 1.3.2011 Completion 1.3.2013
LOT NO: 2 TITLE On-Site installation of the ventilation valves into the Doel 1 and Doel 2 reactor buildings
Installation includes:
— Disassembly and removal of the currently installed ventilation valves,
— Design and fabrication of the necessary equipment needed for (dis-)mounting these components,
— Mounting of the newly fabricated ventilation valves into the reactor building/TUR.
Starting 1.5.2013 Completion 25.5.2013
ADMINISTRATIVE INFORMATION
File reference number attributed by the contracting entity: 0150.P.000954/1
Time limit for receipt of tenders or requests to participate: 1.9.2010 – 14:00
Language(s) in which tenders or requests to participate may be drawn up
English. French. Dutch.