Stephen Lecce, Ontario Minister of Energy and Mines, and René Legacy, Deputy Premier and Minister of Finance, Treasury Board & Energy for New Brunswick, announced that Ontario-based BWXT Canada has been selected to fabricate and deploy Canada’s first Transportable Nuclear Power Plant (TNPP) using its Advanced Nuclear Reactor (BANR) technology.
The BANR microreactor technology was selected by Prodigy Clean Energy, the Pabineau First Nation, and the Eel River Bar First Nation for the TNPP pilot project to be located in Belledune, New Brunswick.
The BWXT Advanced Nuclear Reactor (BANR) is a high-temperature gas-cooled reactor intended to produce 75 MWt or 22 MWe, using high-assay low-enriched uranium (HALEU) fuel in a TRISO (TRI-structural ISOtropic) form.
The pilot facility will be entirely Indigenous-owned, built within the traditional territory of the Pabineau and Eel River Bar First Nations. The full-scale full facility is projected to provide up to 50 MWe of baseload power, which is enough to power roughly 40,000 homes. The TNPP project will create more than 150 jobs during development and support approximately 40 long-term positions once operational.
The project partners are aiming to have the facility operational and in-service by the early 2030s. The Government of New Brunswick has already signed a Letter of Intent to purchase the electricity generated by the facility. The pilot project is intended to serve as a commercial blueprint for deploying TNPP fleets to remote communities and industrial sites across northern Canada and global export markets.
“Ontario is a world leader in nuclear technology, from building the G7’s first grid-scale small modular reactor to delivering major nuclear refurbishment projects ahead of schedule and under budget,” said Lecce. “We’re building on that legacy and proud to announce that Ontario’s nuclear supply chain is being harnessed to build Canada and the G7’s first commercial Transportable Nuclear Power Plant. This is the future of reliable, clean energy for remote and northern communities – including mines – connecting them to reliable baseload power virtually anywhere.”
Developed by Prodigy Clean Energy, the TNPP represents an innovative new approach to deploying nuclear energy in Canada. Unlike traditional nuclear facilities, these plants are designed to be built off site and transported to where power is needed. By integrating small modular reactors and microreactors into transportable power plants, this technology has the potential to bring reliable, clean nuclear energy to a wider range of locations, including remote and northern communities, Indigenous communities and industrial sites.
“By launching the first Indigenous-led nuclear project in Canada and building the supply chain in New Brunswick, we are showcasing the strength and leadership of the province, First Nations, and our nuclear-trained workforce,” said René Legacy. “I am encouraged by potential for this innovative project to drive significant economic growth in the region and provide clean energy for communities across New Brunswick, throughout Canada, and around the world.”
Mathias Trojer, President and CEO, Prodigy Clean Energy, noted: “BWXT’s BANR is a best-in-class advanced nuclear technology with a credible pathway to delivering the G7’s first commercially operating Transportable Nuclear Power Plant. This Canadian pilot will serve as the reference to deploy a BANR-TNPP fleet across Northern, industrial and global energy markets.”
John MacQuarrie, BWXT President of Commercial Operations said the BWXT team is designing BANR to meet a variety of real-world heat and electricity demands that currently cannot be met without the use of carbon-emitting with sources complex fuel logistics. “By joining forces with Prodigy and integrating BANR with Prodigy’s transportable platform design, we are truly expanding BWXT’s horizons for future customers while reinforcing Canada’s role at the forefront of innovative, deployable advanced nuclear energy solutions,” he said.
Prodigy’s TNPP architecture is engineered to package reactors for safe and secure deployment over their multi-decade lifecycle. The modular power plant infrastructure can integrate a single or multiple BANR reactors. BANR-TNPPs can be factory-built, shipped, and installation is targeted at about 18 months. The facility arrives at the site fully assembled, ready for fueling and related fuel-in commissioning.
The TNPP is designed to be reactor-agnostic, meaning they can swap the internal reactor technology based on the project parameters. BWXT’s BANR microreactor ultimately won out for the pilot because of its compact size, high-temperature capabilities, and crucially, BWXT’s massive manufacturing footprint in Ontario. This allowed the project to secure heavy backing from Canadian political leaders looking to utilise an existing domestic nuclear supply chain
Both Westinghouse (eVinci) and NuScale were previously deeply intertwined with the project developers, making them the apparent front-runners before the final technology selection.
In May 2025, the Pabineau and Eel River Bar First Nations signed a formal memorandum of understanding with Westinghouse. The initial plan was to evaluate Westinghouse’s eVinci microreactor and its larger AP300 SMR for the Port of Belledune Green Energy Hub. While Prodigy Clean Energy used Westinghouse’s eVinci microreactor as its primary technical benchmark for two years during initial Canadian R&D, the transition to BWXT’s BANR design came down to three major factors.
- The targeted output for the TNPP facility is up to 50 MWe. The eVinci microreactor produces roughly 5 MWe. To hit the 50 MWe target, Prodigy would have had to pack a cluster of 10 separate eVinci modules inside their transportable marine structure. BANR is significantly more powerful per unit, producing 22 MWe. This means Prodigy only needs to integrate two BANR microreactors to reach their full-scale power target, dramatically simplifying the engineering, plumbing, and physical size of the transportable facility.
- Because this pilot project is intended to serve as a commercial blueprint for widespread deployment across northern Canada, political backing and local economic impact were critical. Westinghouse is a US-headquartered company, and while they have a Canadian presence, BWXT owns a massive, pre-existing nuclear manufacturing footprint in Ontario allowed the partners to secure heavy backing from Ontario and New Brunswick leaders by ensuring the project would be “driven by a Canadian workforce” and built utilizing existing domestic supply chains.
- Westinghouse still has a strong relationship with the local communities. In early 2025, the North Shore Mi’kmaq Tribal Council (which represents regional First Nations) signed an agreement with Westinghouse. However, that agreement specifically prioritised exploring Westinghouse’s AP300 Small Modular Reactor (SMR) for large, grid-scale baseload power and heavy industrial data centres around the Port of Belledune.
Prodigy Clean Energy also has a commercial agreement with NuScale Power. In late 2022, Prodigy unveiled a conceptual design for a larger SMR Marine Power Station specifically designed to house up to 12 NuScale Power Modules. Because the Belledune project is specifically aimed at creating a scalable blueprint for transportable microreactors to serve remote communities, the massive power footprint of a NuScale marine plant was less optimal than smaller, factory-fabricated microreactor units.