RSG Component/Assembly Specification Requirements Challenges Design Fabrication QC
1 Channel head Maintain thermal rating Maintaining reactor coolant flow rate within specified limits X X
Maximize number of heat transfer tubes
Eliminate stay cylinder Optimizing primary side volume X
2 Tubesheet Withstand primary-to-secondary full dP Optimizing tubesheet thickness X
Limit on tube hole runout Tubesheet drilling X X
Minimize number of hole surface imperfections
3 Tube bundle Limit on number of tube dings at time of delivery Controlling tube bundle sag during assembly X X
Monitoring temperature distribution during PWHT of the channel head-to-tubesheet weld
X X
4 Tube-to-tubesheet joints Ensuring adequate tube-to tubesheet joint strength, leak resistance and corrosion resistance Qualifying tube-to-tubesheet joint X X X
Controlling tube-to-tubesheet joint crevice depth X X
Limit on allowable tube-to-tubesheet crevice depth
5 Tube supports Preventing tube wear Configuring tube-to-tube support interface X
Preventing tube denting at tube supports
6 AVB support structure Preventing tube wear AVB structure assembly X X X
7 Feedwater distribution system Elimination of susceptibility to water hammer and thermal stratification Configuring inlet piping to feedwater ring X
Resistance to erosion/corrosion
8 Moisture separators Limit on allowable moisture carryover Designing moisture separator assemblies X



Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.