Design and installation of control valves, Belgium, (Deadline: 1 September 2010)

23 July 2010


Design, study, fabrication, transport, packaging and acceptance by a Belgian control commission of eight butterfly valves, classified according to ASME III code, safety class 3.

CONTACT:

Electrabel S.A. - Kerncentrale Doel

Haven 1800, Scheldemolenstraat

9130 Doel

BELGIUM

www.electrabel.com

Further information can be obtained at: Tractebel Engineering SA,

Avenue Ariane, 7

Attn: M. Lennert Van Damme

1200 Brussels

BELGIUM

Tel. +32 27738285

E-mail: lennert.vandamme@gdfsuez.com

Fax +32 27738900

Internet: www.tractebel-engineering-gdfsuez.com

DESCRIPTION:

Title attributed to the contract by the contracting entity: 0150-P.000954/1: Design, study, delivery, design, qualification and assembly of eight ventilation valves of the Doel1 and 2 reactor building

Type of contract and location of works, place of delivery or of performance: Supplies. Purchase.

Main place of delivery B-9130 Doel

Short description of the contract or purchase(s):

This contract concerns the design, study, delivery, design, qualification and assembly of eight ventilation valves of the Doel1 and 2 reactor buildings.

DURATION OF THE CONTRACT OR TIME LIMIT FOR COMPLETION

Starting 1.3.2011 Completion 25.5.2013

LOT NO: 1 TITLE Fabrication and provision of 8 ventilation valves with driving unit

Delivery includes:

— Design, study, fabrication, transport, packaging and acceptance by a Belgian control commission of eight butterfly valves, classified according to ASME III code, safety class 3,

— Testing of the raw materials (mechanical and chemical),

— Full documentation reports with respect to design, studies, material and testing.

These valves are part of the ventilation system of the Doel1 and Doel2 reactor buildings. They fulfill a crucial safety function because they have to contain a possible radioactive contamination within the containment building.

Starting 1.3.2011 Completion 1.3.2013

LOT NO: 2 TITLE On-Site installation of the ventilation valves into the Doel 1 and Doel 2 reactor buildings

Installation includes:

— Disassembly and removal of the currently installed ventilation valves,

— Design and fabrication of the necessary equipment needed for (dis-)mounting these components,

— Mounting of the newly fabricated ventilation valves into the reactor building/TUR.

Starting 1.5.2013 Completion 25.5.2013

ADMINISTRATIVE INFORMATION

File reference number attributed by the contracting entity: 0150.P.000954/1

Time limit for receipt of tenders or requests to participate: 1.9.2010 - 14:00

Language(s) in which tenders or requests to participate may be drawn up

English. French. Dutch.




Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.